Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow

NM 14 - Roadway Construction

San Antonito: The Department of Transportation will begin Phase 5, the last of the announced upgrades. It calls for an $8-million roundabout at the triangle in San Antonito, the intersection where North 14 meets NM 536 (the Sandia Crest Road) and Frost Road. This phase is likely to start in 2024 and wrap up in 2026. Given the amount of traffic flow the roadwork will be done while trying to minimize disruptions.

Highlighted Event

Upcoming Event

Madrid Christmas Parade and Christmas Open House

Every full weekend December 7 through December 22, 2024
The Madrid Christmas Parade along Main St (Hwy 14) is Saturday, Dec. 7 at 4PM. Madrid Christmas Open House highlights include activities and refreshments in many shops each weekend through Christmas.
Event details »
View all events »